Transit times / Alo Llc

Alo Llc

324 ocean import shipments. Delayed 1.2 points less often than the dataset average of 43.8%.

324
Shipments
42.6%
Arrived late
138 shipments
7.1 days
Average delay, when late
median 3 days
15 days
Worst single delay

How late, when late

Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.

12
3.7%
Early
174
53.7%
On time
82
25.3%
1–3 days
2
0.6%
4–7 days
2
0.6%
8–14 days
52
16%
15+ days

By carrier

All 6 carriers used.

% delayed avg days late, when laten = shipments
  1. Expeditors International
    58.9%
    3.2d
    15189 late
  2. Zim
    0%
    810 late
  3. EFLR
    78.7%
    14.4d
    6148 late
  4. CMA CGM
    0%
    230 late
  5. Seth Shipping
    0%
    70 late
  6. MSC
    100%
    5d
    11 late

By route

Top 12 of 18 lanes; 6 shipments across the remaining 6 not shown.

% delayed avg days late, when laten = shipments
  1. Vung Tau > Long Beach, Ca
    95.6%
    7.6d
    9187 late
  2. All Other Viet Nam Ports > Long Beach, Ca
    0%
    620 late
  3. Yantian > Long Beach, Ca
    23.9%
    13.9d
    4611 late
  4. Singapore > Los Angeles, Ca
    51.4%
    1d
    3518 late
  5. Kaohsiung > Los Angeles, Ca
    0%
    260 late
  6. Hai Phong > Los Angeles, Ca
    4.2%
    15d
    241 late
  7. Kaohsiung > Long Beach, Ca
    0%
    140 late
  8. Istanbul > Newark, Nj
    100%
    7.3d
    77 late
  9. Shanghai > Long Beach, Ca
    100%
    3d
    44 late
  10. Vung Tau > Los Angeles, Ca
    100%
    3d
    44 late
  11. Santo Tomas De Castilla > Pt. Everglades, Florida
    0%
    30 late
  12. Hai Phong > Long Beach, Ca
    0%
    20 late

By supplier

Top 12 of 40 suppliers; 115 shipments across the remaining 28 not shown.

% delayed avg days late, when laten = shipments
  1. Fashion Garments 2 Co Ltd
    61.3%
    14.4d
    3119 late
  2. Aroma Success Garment Co Ltd
    73.3%
    2d
    3022 late
  3. Manchu Times Fashion Limited
    48.1%
    13.2d
    2713 late
  4. Alston Apparel Inc
    7.7%
    1d
    262 late
  5. Metro Wear Inc
    0%
    160 late
  6. Expeditors Vietnam Co Ltd
    25%
    15d
    164 late
  7. Pt Hj Busana Indah
    26.7%
    1d
    154 late
  8. Pt Eclat Textile International
    36.4%
    1d
    114 late
  9. Eclat Textile Cambodia Co Ltd
    20%
    2d
    102 late
  10. Aw Cashmere Cambodia Co Ltd
    0%
    100 late
  11. Sabrina Cambodia Garment Manufact
    100%
    3d
    99 late
  12. Yingtong Knitting Cambodia Co
    100%
    2d
    88 late

By vessel

Vessel names are in the most recent data only — 324 of 324 shipments (100%) name one, across 23 ships. This chart covers that subset, not the whole.

% delayed avg days late, when laten = shipments
  1. Colorado
    0%
    880 late
  2. Danube
    61.5%
    15d
    3924 late
  3. Msc Ilaria
    100%
    2d
    3434 late
  4. Ever Mild
    0%
    260 late
  5. Nestos
    100%
    15d
    2323 late
  6. Conti Conquest
    10.5%
    1d
    192 late
  7. Ym Width
    100%
    3d
    1818 late
  8. One Commitment
    100%
    1d
    1616 late
  9. Cosco Shipping Denali
    0%
    140 late
  10. Cma Cgm Tarpon
    0%
    110 late
  11. Cma Cgm Swordfish
    0%
    80 late
  12. Msc Bianca Silvia
    100%
    3d
    44 late

Delay rate by arrival date

Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.

65.4%
n=52
2026-07-27
0%
n=15
2026-07-28
100%
n=23
2026-07-29
100%
n=36
2026-07-30
100%
n=7
2026-07-31
10.5%
n=19
2026-08-02
0%
n=3
2026-08-03
0.8%
n=126
2026-08-04
100%
n=1
2026-08-05
100%
n=1
2026-08-06
100%
n=8
2026-08-07
11.1%
n=9
2026-08-10
100%
n=24
2026-08-11

By destination port

Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.

% delayed avg days late, when laten = shipments
  1. Long Beach, Ca
    47.5%
    8.1d
    223106 late
  2. Los Angeles, Ca
    27.5%
    2.7d
    9125 late
  3. Newark, Nj
    100%
    7.3d
    77 late
  4. Pt. Everglades, Florida
    0%
    30 late

By supplier country

Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.

% delayed avg days late, when laten = shipments
  1. Vietnam
    39.8%
    14.3d
    12851 late
  2. Cambodia
    57.3%
    2.3d
    8951 late
  3. Philippines
    4.8%
    1d
    422 late
  4. Indonesia
    40%
    1d
    4016 late
  5. China
    66.7%
    6d
    128 late
  6. Turkey
    100%
    7.3d
    77 late
  7. Guatemala
    0%
    30 late
  8. Macau S.A.R
    100%
    3d
    22 late
  9. Taiwan
    100%
    8d
    11 late

Reading this

Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.

A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.

Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.

Track a shipment live →