Transit times / Binex Line Corp

Binex Line Corp

61 ocean import shipments. Delayed 11 points less often than the dataset average of 43.8%.

61
Shipments
32.8%
Arrived late
20 shipments
6.3 days
Average delay, when late
median 3 days
30 days
Worst single delay

How late, when late

Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.

1
1.6%
Early
40
65.6%
On time
11
18%
1–3 days
0
0%
4–7 days
8
13.1%
8–14 days
1
1.6%
15+ days

By carrier

All 9 carriers used.

% delayed avg days late, when laten = shipments
  1. Yang Ming
    0%
    260 late
  2. ONE
    26.7%
    3d
    154 late
  3. HMM
    100%
    7.1d
    1111 late
  4. COSCO
    100%
    1d
    33 late
  5. Evergreen
    0%
    20 late
  6. CMA CGM
    0%
    10 late
  7. Hapag Lloyd
    0%
    10 late
  8. Zim
    100%
    30d
    11 late
  9. Wan Hai Lines
    100%
    2d
    11 late

By route

All 11 lanes.

% delayed avg days late, when laten = shipments
  1. Pusan > Los Angeles, Ca
    19.5%
    9d
    418 late
  2. Pusan > Savannah, Ga.
    100%
    3d
    44 late
  3. Pusan > Oakland, Ca
    0%
    40 late
  4. Pusan > Miami, Florida
    100%
    1d
    33 late
  5. Hai Phong > Los Angeles, Ca
    100%
    2d
    33 late
  6. Pusan > Baltimore, Md.
    0%
    10 late
  7. Yangshan > Baltimore, Md.
    0%
    10 late
  8. Shanghai > Houston, Texas
    0%
    10 late
  9. Kaohsiung > Los Angeles, Ca
    0%
    10 late
  10. Pusan > Seattle, Wa
    100%
    30d
    11 late
  11. Vung Tau > Los Angeles, Ca
    100%
    2d
    11 late

By supplier

Top 12 of 22 suppliers; 10 shipments across the remaining 10 not shown.

% delayed avg days late, when laten = shipments
  1. Gbs Logistics Co Ltd
    5%
    3d
    201 late
  2. Woowon Sea & Air Co Ltd
    33.3%
    1.7d
    93 late
  3. Binex Line Corp
    0%
    60 late
  4. Tl Inc Co Ltd
    100%
    2d
    33 late
  5. Kt Logistics Co Ltd
    0%
    20 late
  6. Pacific Bridge Co Ltd
    100%
    9d
    22 late
  7. Heyjin S And T Corp
    100%
    3d
    22 late
  8. Taewoong Logistics Co Ltd
    100%
    9d
    22 late
  9. Mc Logistic Service Co Ltd
    0%
    20 late
  10. Woowon Sea Air Co Ltd
    0%
    10 late
  11. Global Pro Logistics Co Ltd
    0%
    10 late
  12. Shanghai Seatank International
    0%
    10 late

Delay rate by arrival date

Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.

33.3%
n=57
2026-08-04
25%
n=4
2026-08-05

By destination port

Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.

% delayed avg days late, when laten = shipments
  1. Los Angeles, Ca
    26.1%
    6.7d
    4612 late
  2. Savannah, Ga.
    100%
    3d
    44 late
  3. Oakland, Ca
    0%
    40 late
  4. Miami, Florida
    100%
    1d
    33 late
  5. Baltimore, Md.
    0%
    20 late
  6. Houston, Texas
    0%
    10 late
  7. Seattle, Wa
    100%
    30d
    11 late

By supplier country

Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.

% delayed avg days late, when laten = shipments
  1. South Korea
    29.6%
    7.3d
    5416 late
  2. Vietnam
    100%
    2d
    44 late
  3. China
    0%
    20 late
  4. Taiwan
    0%
    10 late

Reading this

Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.

A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.

Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.

Track a shipment live →