Transit times / Efl Container Lines Llc
Efl Container Lines Llc
259 ocean import shipments. Delayed 16.4 points less often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 6 carriers used.
- ONE13251 late
- Zim10014 late
- Maersk102 late
- CMA CGM74 late
- MSC50 late
- Seth Shipping50 late
By route
Top 12 of 29 lanes; 36 shipments across the remaining 17 not shown.
- Hai Phong > Los Angeles, Ca4319 late
- Yantian > Long Beach, Ca400 late
- Vung Tau > Los Angeles, Ca3511 late
- All Other Viet Nam Ports > Long Beach, Ca210 late
- Hai Phong > Long Beach, Ca150 late
- Shanghai > Los Angeles, Ca130 late
- Ning Bo > Newark, Nj1111 late
- Pusan > Los Angeles, Ca110 late
- Mina Raysut > Newark, Nj102 late
- Xiamen > Los Angeles, Ca88 late
- Singapore > Los Angeles, Ca80 late
- Pusan > Savannah, Ga.88 late
By supplier
Top 12 of 18 suppliers; 7 shipments across the remaining 6 not shown.
- Expolanka Freight Vietnam Ltd9727 late
- Expo Freight Shanghai Limited5724 late
- Expolanka Freight Cambodia Ltd433 late
- Expofreight Shenzhen Limited1210 late
- Expolanka Freight Vietnam Limited110 late
- Expolanka Freight Ltd91 late
- Pt Efl Global Indonesia80 late
- Expo Freight Pvt Ltd33 late
- Efl Taiwan Pvt Ltd31 late
- Expolanka Freight Vietnam30 late
- Expolanka Freight Philippines30 late
- Efl Global Thailand Co Ltd30 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca12939 late
- Long Beach, Ca760 late
- Newark, Nj3116 late
- Savannah, Ga.1312 late
- New York, N.Y.44 late
- Oakland, Ca30 late
- Norfolk, Va.20 late
- Miami, Florida10 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- Vietnam11127 late
- China8931 late
- Cambodia163 late
- Indonesia80 late
- South Korea73 late
- Oman51 late
- India44 late
- Kenya40 late
- Taiwan31 late
- Philippines30 late
- Thailand30 late
- Turkey20 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.