Transit times / Euro America Container Line Inc

Euro America Container Line Inc

212 ocean import shipments. Delayed 27.8 points less often than the dataset average of 43.8%.

212
Shipments
16%
Arrived late
34 shipments
1.1 days
Average delay, when late
median 1 days
2 days
Worst single delay

How late, when late

Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.

0
0%
Early
178
84%
On time
34
16%
1–3 days
0
0%
4–7 days
0
0%
8–14 days
0
0%
15+ days

By carrier

All 6 carriers used.

% delayed avg days late, when laten = shipments
  1. Zim
    0.9%
    1d
    1161 late
  2. CMA CGM
    80%
    1d
    3528 late
  3. COSCO
    0%
    300 late
  4. HEDE Shipping
    0%
    150 late
  5. Evergreen
    0%
    110 late
  6. Wan Hai Lines
    100%
    2d
    55 late

By route

All 8 lanes.

% delayed avg days late, when laten = shipments
  1. Yantian > Long Beach, Ca
    0%
    1340 late
  2. Yantian > Los Angeles, Ca
    71.8%
    1d
    3928 late
  3. Nansha > Los Angeles, Ca
    0%
    150 late
  4. Ning Bo > Los Angeles, Ca
    0%
    120 late
  5. Shanghai > Los Angeles, Ca
    0%
    50 late
  6. Shekou > Los Angeles, Ca
    100%
    2d
    55 late
  7. Shekou > Miami, Florida
    0%
    10 late
  8. Yantian > Boston, Mass.
    100%
    1d
    11 late

By supplier

Top 12 of 14 suppliers; 3 shipments across the remaining 2 not shown.

% delayed avg days late, when laten = shipments
  1. Ronghang Dongguan International
    1.1%
    1d
    951 late
  2. Everstar Supply Chain Tech Co
    100%
    1d
    2323 late
  3. Everstar Guangdong Supply Chain T
    0%
    210 late
  4. Ningbo Yujiu Freight Agent Co Ltd
    0%
    200 late
  5. Deksu E Commerce Logistics
    0%
    130 late
  6. Ronghang Dongguan International F
    25%
    2d
    123 late
  7. Everstar Shipping Hong Kong Co
    0%
    80 late
  8. Zhuhai Link Faster Supply Chain
    0%
    60 late
  9. Ronghang Intl Freight Fwdg Co
    80%
    1d
    54 late
  10. Dlx International Logistics Co Lt
    0%
    20 late
  11. Guangdong Risun Supply Chain
    0%
    20 late
  12. Victoria Shipping Hong Kong
    0%
    20 late

Delay rate by arrival date

Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.

16%
n=181
2026-08-04
16.1%
n=31
2026-08-05

By destination port

Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.

% delayed avg days late, when laten = shipments
  1. Long Beach, Ca
    0%
    1340 late
  2. Los Angeles, Ca
    43.4%
    1.2d
    7633 late
  3. Miami, Florida
    0%
    10 late
  4. Boston, Mass.
    100%
    1d
    11 late

By supplier country

Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.

% delayed avg days late, when laten = shipments
  1. Grenada
    1%
    1d
    1021 late
  2. China
    34.4%
    1.2d
    9633 late
  3. Norway
    0%
    140 late

Reading this

Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.

A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.

Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.

Track a shipment live →