Transit times / Hecny Transportation Inc

Hecny Transportation Inc

286 ocean import shipments. Delayed 21.1 points less often than the dataset average of 43.8%.

286
Shipments
22.7%
Arrived late
65 shipments
3.1 days
Average delay, when late
median 2 days
30 days
Worst single delay

How late, when late

Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.

15
5.2%
Early
206
72%
On time
53
18.5%
1–3 days
9
3.1%
4–7 days
2
0.7%
8–14 days
1
0.3%
15+ days

By carrier

All 11 carriers used.

% delayed avg days late, when laten = shipments
  1. Evergreen
    1.1%
    2d
    891 late
  2. Maersk
    10.4%
    1.4d
    677 late
  3. Zim
    23.1%
    4.4d
    399 late
  4. COSCO
    27.3%
    1.3d
    226 late
  5. ONE
    35.3%
    1.7d
    176 late
  6. Hapag Lloyd
    81.3%
    4.2d
    1613 late
  7. MSC
    58.3%
    2.4d
    127 late
  8. Wan Hai Lines
    100%
    2d
    1212 late
  9. CMA CGM
    0%
    70 late
  10. Yang Ming
    66.7%
    5d
    32 late
  11. HMM
    100%
    13d
    22 late

By route

Top 12 of 53 lanes; 105 shipments across the remaining 41 not shown.

% delayed avg days late, when laten = shipments
  1. Yantian > Los Angeles, Ca
    0%
    440 late
  2. Cartagena > Miami, Florida
    0%
    220 late
  3. Yantian > Oakland, Ca
    0%
    180 late
  4. Yantian > Long Beach, Ca
    0%
    180 late
  5. Lazaro Cardenas > Houston, Texas
    0%
    170 late
  6. Yantian > Savannah, Ga.
    7.1%
    5d
    141 late
  7. Qingdao > Los Angeles, Ca
    0%
    140 late
  8. Kaohsiung > Los Angeles, Ca
    0%
    80 late
  9. Yangshan > Houston, Texas
    0%
    80 late
  10. Ning Bo > Newark, Nj
    16.7%
    1d
    61 late
  11. Shekou > Miami, Florida
    0%
    60 late
  12. Shanghai > Newark, Nj
    100%
    2.7d
    66 late

By supplier

Top 12 of 21 suppliers; 16 shipments across the remaining 9 not shown.

% delayed avg days late, when laten = shipments
  1. Hecny Transportation Shanghai
    8.6%
    6.9d
    1059 late
  2. Hecny Shipping Limited
    41.2%
    2.3d
    6828 late
  3. Ho Chi Minh City Branch Hecny Shipp
    17.4%
    2d
    234 late
  4. Hecny Shipping Ltd
    20%
    2d
    204 late
  5. Ho Chi Minh City Branch
    25%
    1d
    164 late
  6. Hecny Transportation Shanghai Ltd
    22.2%
    1d
    92 late
  7. Hector Transportation Thailand
    14.3%
    1d
    71 late
  8. Hecny Transportation Shanghai Limit
    0%
    50 late
  9. Hecny Transportation Taiwan Ltd
    40%
    7d
    52 late
  10. Hecny Transportation M Sdn Bhd
    0%
    40 late
  11. Hector Transportation Cambodia Co
    50%
    1d
    42 late
  12. Pt Hecny Transportation Bahari Ind
    100%
    1.3d
    44 late

Delay rate by arrival date

Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.

24.1%
n=141
2026-08-04
21.4%
n=145
2026-08-05

By destination port

Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.

% delayed avg days late, when laten = shipments
  1. Los Angeles, Ca
    15%
    3.4d
    10015 late
  2. Houston, Texas
    0%
    370 late
  3. Miami, Florida
    0%
    280 late
  4. Savannah, Ga.
    50%
    2.1d
    2613 late
  5. Long Beach, Ca
    0%
    210 late
  6. Oakland, Ca
    0%
    190 late
  7. Newark, Nj
    64.3%
    2.4d
    149 late
  8. Charleston, S.C.
    90.9%
    5.2d
    1110 late
  9. Norfolk, Va.
    0%
    80 late
  10. Tacoma, Wa
    50%
    1d
    63 late
  11. Jacksonville, Fla.
    100%
    5.8d
    66 late
  12. Baltimore, Md.
    80%
    1d
    54 late

By supplier country

Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.

% delayed avg days late, when laten = shipments
  1. China
    17.1%
    3.5d
    19333 late
  2. Vietnam
    20%
    1.5d
    408 late
  3. Grenada
    30%
    2.3d
    103 late
  4. Indonesia
    71.4%
    1.4d
    75 late
  5. Thailand
    14.3%
    1d
    71 late
  6. Philippines
    16.7%
    2d
    61 late
  7. Taiwan
    40%
    7d
    52 late
  8. Malaysia
    0%
    40 late
  9. Germany
    100%
    9.3d
    33 late
  10. Saint Helena
    100%
    1d
    33 late
  11. Cambodia
    66.7%
    1d
    32 late
  12. South Korea
    100%
    2d
    22 late

Reading this

Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.

A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.

Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.

Track a shipment live →