Transit times / Home Depot Usa Inc
Home Depot Usa Inc
3,141 ocean import shipments. Delayed 4.9 points more often than the dataset average of 43.8%.
Live tracking
2,331 of this company’s 3,141 references have been tracked against the carriers themselves. Transit and dwell come from that subset — they are measured from carrier milestones, not from the manifest, which knows only the arrival.
Transit time by route
Actual departure to actual arrival, from the carrier's own milestones. Lanes with fewer than three tracked shipments are left out.
- Yantian > Savannah, Ga.183mean 35.7d
- Vung Tau > Savannah, Ga.131mean 46.1d
- Yantian > Newark, Nj107mean 39.1d
- Vung Tau > Los Angeles, Ca90mean 25.3d
- Vung Tau > Newark, Nj87mean 40.4d
- Yantian > Houston, Texas81mean 31.2d
- Yantian > Los Angeles, Ca75mean 17.8d
- Singapore > Newark, Nj50mean 29.3d
- Laem Chabang > Long Beach, Ca50mean 28.7d
- Laem Chabang > Los Angeles, Ca49mean 29.3d
- Ning Bo > Los Angeles, Ca48mean 15.8d
- Kaohsiung > Los Angeles, Ca44mean 31.4d
Dwell at transshipment hubs
Days between arriving at an intermediate port and leaving it, counted only where the carrier published both as actuals. Where a shipment called at several hubs its dwell is divided evenly between them rather than attributed to one.
- KAOHSIUNG (TW)157mean 6d
- SINGAPORE, SINGAPORE110mean 7.2d
- SINGAPORE108mean 8.7d
- CAI MEP, VIETNAM103mean 3.7d
- PUSAN, REPUBLIC OF KOREA88mean 8.4d
- VUNG TAU87mean 4d
- YANTIAN61mean 8.3d
- YANTIAN, CN59mean 7.6d
- YANTIAN, CHINA (CN)44mean 7.8d
- SHANGHAI34mean 4d
- HONG KONG (HK)28mean 7.1d
- VUNG TAU, VN28mean 5.5d
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
Top 12 of 13 carriers; 1 shipments across the remaining 1 not shown.
- Evergreen972221 late
- CMA CGM793648 late
- ONE596152 late
- Hapag Lloyd377218 late
- HMM213132 late
- MSC150136 late
- COSCO2318 late
- Expeditors International73 late
- MZLY60 late
- DNYC10 late
- APLL11 late
- UNQL10 late
By route
Top 12 of 131 lanes; 1,720 shipments across the remaining 119 not shown.
- Yantian > Savannah, Ga.23148 late
- Vung Tau > Savannah, Ga.16976 late
- Yantian > Newark, Nj16572 late
- Vung Tau > Newark, Nj129104 late
- Yantian > Los Angeles, Ca12148 late
- Vung Tau > Los Angeles, Ca11415 late
- Yantian > Houston, Texas9228 late
- Shanghai > Savannah, Ga.8585 late
- Yantian > Seattle, Wa8181 late
- Laem Chabang > Newark, Nj7964 late
- Shanghai > Long Beach, Ca7977 late
- Laem Chabang > Long Beach, Ca7630 late
By supplier
Top 12 of 255 suppliers; 1,536 shipments across the remaining 243 not shown.
- Maersk Logistics Services China227214 late
- Maersk Logistics & Services China22570 late
- Polygroup Evergreen Limited20877 late
- Geelong Thailand Co Ltd16182 late
- Toshiba Consumer Products14687 late
- Yida New Material Thailand Co Ltd12667 late
- Pan Asian Creations Ltd12555 late
- Seasonal Visions International Ltd10564 late
- Toyo Electric Huizhou Co Ltd7921 late
- Holiday Design Cambodia Co Ltd7834 late
- Willis Electric Company6423 late
- Pt Karya Unggul Indonesia6120 late
By vessel
Vessel names are in the most recent data only — 3,018 of 3,141 shipments (96%) name one, across 118 ships. This chart covers that subset, not the whole.
- Ever Muse24046 late
- Taurus1680 late
- Ever Mild1450 late
- One Manchester9176 late
- Conti Cortesia8721 late
- Taipei Triumph8080 late
- Tempanos7979 late
- Ever Mercy770 late
- Ever Loyal700 late
- One Aquila706 late
- Cma Cgm Syracuse6866 late
- Oocl Tulip6441 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Savannah, Ga.776359 late
- Newark, Nj628393 late
- Los Angeles, Ca49699 late
- Houston, Texas304120 late
- Long Beach, Ca253143 late
- Tacoma, Wa216114 late
- Norfolk, Va.200125 late
- Seattle, Wa138138 late
- Oakland, Ca9535 late
- Baltimore, Md.301 late
- New York, N.Y.22 late
- Miami, Florida10 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China1,268629 late
- Thailand642369 late
- Vietnam473253 late
- Cambodia297117 late
- Indonesia13337 late
- Taiwan11830 late
- Malaysia6419 late
- South Korea5319 late
- Germany2118 late
- Philippines134 late
- Norway1211 late
- India102 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.