Transit times / Ikea Supply Ag
Ikea Supply Ag
4,761 ocean import shipments. Delayed 4.3 points more often than the dataset average of 43.8%.
Live tracking
2,675 of this company’s 4,761 references have been tracked against the carriers themselves. Transit and dwell come from that subset — they are measured from carrier milestones, not from the manifest, which knows only the arrival.
Transit time by route
Actual departure to actual arrival, from the carrier's own milestones. Lanes with fewer than three tracked shipments are left out.
- Sines > Long Beach, Ca167mean 39.5d
- Bremerhaven > Newark, Nj107mean 32.8d
- Gioia Tauro > Baltimore, Md.104mean 39.5d
- Cartagena > Philadelphia, Pa.94mean 45.9d
- Gioia Tauro > Long Beach, Ca82mean 52.5d
- (port not stated) > Philadelphia, Pa.81mean 16.2d
- Shekou > Los Angeles, Ca80mean 19.5d
- Ning Bo > Tacoma, Wa71mean 32.2d
- Wilhelmshaven > Philadelphia, Pa.68mean 31.5d
- Cristobal > Philadelphia, Pa.68mean 49.8d
- Bremerhaven > Baltimore, Md.60mean 41.9d
- Sines > Seattle, Wa57mean 56.3d
Dwell at transshipment hubs
Days between arriving at an intermediate port and leaving it, counted only where the carrier published both as actuals. Where a shipment called at several hubs its dwell is divided evenly between them rather than attributed to one.
- SINES, PT258mean 5.5d
- GIOIA TAURO, IT256mean 6.1d
- BREMERHAVEN, DE181mean 3.6d
- TEKIRDAG (ASYAPORT), TR180mean 5.1d
- LE HAVRE, FR148mean 6.1d
- KLAIPEDA, LT139mean 4.9d
- BREMERHAVEN, GERMANY — NTB NORTH SEA TERMINAL BREMERHAVEN135mean 7.6d
- HAMBURG101mean 8.1d
- KINGSTON82mean 9.1d
- WILHELMSHAVEN79mean 7.6d
- VALENCIA, ES76mean 5d
- CARTAGENA72mean 4.1d
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 9 carriers used.
- MSC1,7191,225 late
- Hapag Lloyd1,095149 late
- ONE474216 late
- Evergreen46379 late
- HMM409238 late
- Maersk347138 late
- Zim164158 late
- CMA CGM8988 late
- Kuehne + Nagel11 late
By route
Top 12 of 133 lanes; 3,071 shipments across the remaining 121 not shown.
- (port not stated) > Philadelphia, Pa.1800 late
- Sines > Long Beach, Ca1780 late
- Sines > Seattle, Wa163163 late
- Yantian > Long Beach, Ca16018 late
- Cartagena > Philadelphia, Pa.157157 late
- Ning Bo > Los Angeles, Ca15261 late
- Ning Bo > Tacoma, Wa142100 late
- Wilhelmshaven > Philadelphia, Pa.1300 late
- Bremerhaven > Newark, Nj11064 late
- Panama Canal > Baltimore, Md.1080 late
- Shekou > Los Angeles, Ca10680 late
- Gioia Tauro > Baltimore, Md.104104 late
By supplier
Top 12 of 570 suppliers; 3,416 shipments across the remaining 558 not shown.
- Friul Intagli Industries Spa280243 late
- Media Profili S R163117 late
- Ikea Industrial Poland Sp Z O O15452 late
- Ikea Industrial Portugal Lda145118 late
- Yong Rui Furniture Vietnam Co Ltd12384 late
- Ab Vilniaus Baldai843 late
- Uab Freda847 late
- Friul Intagli Industries S P A7421 late
- Aramis Invest Srl7257 late
- Ab Klaipedos Baldai603 late
- Meyenburger Moebel Gmbh5625 late
- 3 B Spa5041 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Philadelphia, Pa.856450 late
- Baltimore, Md.829396 late
- Los Angeles, Ca699258 late
- Long Beach, Ca52545 late
- Tacoma, Wa399291 late
- Savannah, Ga.375250 late
- Norfolk, Va.335100 late
- Newark, Nj282196 late
- Seattle, Wa262262 late
- Houston, Texas17419 late
- Oakland, Ca1313 late
- Boston, Mass.1212 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China1,677688 late
- Poland753374 late
- Italy664477 late
- Lithuania33823 late
- Romania234138 late
- India197111 late
- Portugal189141 late
- Vietnam16994 late
- Germany10054 late
- Thailand8432 late
- Turkey6416 late
- Taiwan516 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.