Transit times / Kubota Tractor Corp
Kubota Tractor Corp
109 ocean import shipments. Delayed 3 points more often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 10 carriers used.
- ONE7436 late
- KWEO166 late
- Evergreen75 late
- CEXQ41 late
- Hapag Lloyd31 late
- WLWH10 late
- SSBF10 late
- FCCJ11 late
- EGET10 late
- WJLN11 late
By route
Top 12 of 17 lanes; 5 shipments across the remaining 5 not shown.
- Tokyo > Los Angeles, Ca253 late
- Pusan > Savannah, Ga.2222 late
- Kobe > Los Angeles, Ca213 late
- Kobe > Oakland, Ca169 late
- Antwerp > Savannah, Ga.77 late
- Stadersand > Newark, Nj30 late
- Yangshan > Baltimore, Md.20 late
- Tokyo > Oakland, Ca21 late
- Bremerhaven > Savannah, Ga.22 late
- Antwerp > Houston, Texas21 late
- Zeebrugge > Galveston, Texas10 late
- Misaki > Seattle, Wa10 late
By supplier
All 10 suppliers.
- Kubota Corp8938 late
- Kubota Baumaschinen Gmbh87 late
- Motoseal Components Oy30 late
- Kverneland Group Kertemide21 late
- Kverneland Group Ravenna Srl21 late
- Kubota Farm Machinery Europe S A S10 late
- Kverneland Group Ravenna11 late
- Qingdao Tianhai Rubber And11 late
- Hangzhou Shengchi Machinery Co Ltd11 late
- Kverneland Group Metz S A S11 late
By vessel
Vessel names are in the most recent data only — 109 of 109 shipments (100%) name one, across 15 ships. This chart covers that subset, not the whole.
- Navios Cyan360 late
- Ym Tiptop2222 late
- Mol Proficiency186 late
- One Modern1010 late
- Ever Mega99 late
- Pl Germany30 late
- Ever Favor20 late
- Apl California21 late
- Titus10 late
- Nadi Chief10 late
- Porto Germeno10 late
- Ever Lively11 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca477 late
- Savannah, Ga.3231 late
- Oakland, Ca1810 late
- Newark, Nj30 late
- Baltimore, Md.20 late
- Norfolk, Va.21 late
- Houston, Texas21 late
- Galveston, Texas10 late
- Seattle, Wa10 late
- Long Beach, Ca11 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- Japan8938 late
- Germany107 late
- Belgium31 late
- Denmark32 late
- China22 late
- Italy21 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.