Transit times / Lacinos Speedcargo Corp
Lacinos Speedcargo Corp
105 ocean import shipments. Delayed 5.7 points more often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 9 carriers used.
- Evergreen362 late
- Wan Hai Lines3333 late
- HMM99 late
- ONE71 late
- Yang Ming60 late
- Zim55 late
- COSCO41 late
- HEDE Shipping30 late
- CMA CGM21 late
By route
Top 12 of 19 lanes; 8 shipments across the remaining 7 not shown.
- Shekou > Los Angeles, Ca2626 late
- Yantian > Los Angeles, Ca211 late
- Ning Bo > Los Angeles, Ca159 late
- Pusan > Los Angeles, Ca60 late
- Yantian > Oakland, Ca50 late
- Yantian > Savannah, Ga.50 late
- Ning Bo > Newark, Nj55 late
- Shanghai > Los Angeles, Ca41 late
- Xiamen > Long Beach, Ca30 late
- Taipei > Los Angeles, Ca31 late
- Ning Bo > Savannah, Ga.22 late
- Kaohsiung > Los Angeles, Ca20 late
By supplier
Top 12 of 14 suppliers; 2 shipments across the remaining 2 not shown.
- Patson Logistics Limited5426 late
- Cas International Co Ltd1311 late
- Ningbo Port Southeast Logistics120 late
- General Merchandise Consolidators50 late
- Ningbo Port Southeast Logistics Gr44 late
- Rain Logistics Co Ltd30 late
- Shenzhen Wsc Global Forwarding Comp30 late
- Ningbo Port Southeast Logistics Gro33 late
- Hansen Transport Cambodia Co Lt33 late
- Ningbo Yimei Logistics Technology C11 late
- Premier Shipping Service Limited11 late
- Sinpex Connection Logistics Limited11 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca7940 late
- Savannah, Ga.94 late
- Oakland, Ca50 late
- Newark, Nj55 late
- Long Beach, Ca30 late
- Charleston, S.C.33 late
- Baltimore, Md.10 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China9547 late
- Taiwan61 late
- Cambodia33 late
- South Korea11 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.