Transit times / Lc Logistics Services Inc
Lc Logistics Services Inc
109 ocean import shipments. Delayed 7.1 points less often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 10 carriers used.
- COSCO210 late
- Zim183 late
- Wan Hai Lines1616 late
- HMM1616 late
- Maersk120 late
- Evergreen110 late
- ONE65 late
- HEDE Shipping40 late
- CMA CGM30 late
- MSC20 late
By route
Top 12 of 19 lanes; 8 shipments across the remaining 7 not shown.
- Ning Bo > Los Angeles, Ca236 late
- Yantian > Long Beach, Ca200 late
- Shanghai > Los Angeles, Ca1616 late
- Ning Bo > Houston, Texas80 late
- Yantian > Los Angeles, Ca70 late
- Shekou > Los Angeles, Ca66 late
- Ning Bo > Newark, Nj42 late
- Nansha > Los Angeles, Ca40 late
- Pusan > Savannah, Ga.44 late
- Yantian > Oakland, Ca30 late
- Cartagena > Miami, Florida30 late
- Xiamen > Los Angeles, Ca33 late
By supplier
Top 12 of 20 suppliers; 8 shipments across the remaining 8 not shown.
- U S United Logistics Ningbo Inc4425 late
- U S United Logistics Ningbo Incor210 late
- Safround Logistics Co Ltd81 late
- Ningbo Zhongyao New Energy Co Ltd50 late
- Concord Tianjin International Freig40 late
- U S United Logistics Ningbo40 late
- Ningbo Lc Supply Chain Management30 late
- Sinpex Connection Logistics Ltd33 late
- Shanghai Zehong International33 late
- Shenzhen Ronghua Yunda20 late
- Ningbo Mengyao New Energy Co Ltd20 late
- Emprise International Transportatio22 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca6031 late
- Long Beach, Ca200 late
- Houston, Texas90 late
- Savannah, Ga.75 late
- Newark, Nj53 late
- Miami, Florida40 late
- Oakland, Ca30 late
- Charleston, S.C.11 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China10133 late
- South Korea54 late
- Norway22 late
- Vietnam11 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.