Transit times / Levi Strauss & Co
Levi Strauss & Co
664 ocean import shipments. Delayed 31.9 points less often than the dataset average of 43.8%.
Includes shipments filed under: Levi Strauss & Co · Levi Strauss Co
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 10 carriers used.
- Maersk63167 late
- MZLY74 late
- KFUN66 late
- CMA CGM50 late
- PUSJ40 late
- Hapag Lloyd30 late
- AWSL30 late
- ONE30 late
- SXCO11 late
- APXL11 late
By route
Top 12 of 16 lanes; 5 shipments across the remaining 4 not shown.
- Colombo Harbor > Newark, Nj3493 late
- Yangshan > Long Beach, Ca810 late
- Mina Raysut > Newark, Nj6132 late
- Ning Bo > Los Angeles, Ca510 late
- Tangier > Newark, Nj480 late
- Algeciras > Newark, Nj3632 late
- Vung Tau > Los Angeles, Ca110 late
- Singapore > Los Angeles, Ca86 late
- Pusan > Los Angeles, Ca44 late
- Port Natal > Newark, Nj40 late
- Yantian > Los Angeles, Ca30 late
- Ning Bo > Long Beach, Ca30 late
By supplier
Top 12 of 55 suppliers; 162 shipments across the remaining 43 not shown.
- Denimach Limited920 late
- Ananta Denim Technology Ltd722 late
- Refat Garments Ltd710 late
- Maersk Ls Egypt Free Zone6520 late
- Mbm Garments Ltd390 late
- Cutting Edge Industries Ltd380 late
- Dekko Garments Ltd310 late
- Denitex Ltd280 late
- Akhtar Textile Industries Pvt Ltd202 late
- Style Textile Pvt Ltd1911 late
- Damco Pakistan Pvt Ltd147 late
- Probridhi Apparels Ltd130 late
By vessel
Vessel names are in the most recent data only — 664 of 664 shipments (100%) name one, across 25 ships. This chart covers that subset, not the whole.
- Ain Snan Express2692 late
- Gerd Maersk810 late
- Madrid Express790 late
- Gsl Christen490 late
- Delaware Express430 late
- Leda Maersk3232 late
- Maersk Denver2019 late
- Seroja Lima190 late
- Good Prospect1414 late
- Maersk Kinloss83 late
- Seattle Bridge66 late
- Luna Maersk60 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Newark, Nj50268 late
- Long Beach, Ca851 late
- Los Angeles, Ca7710 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- Bangladesh4592 late
- Pakistan6229 late
- Morocco480 late
- Spain3632 late
- Cambodia156 late
- Vietnam110 late
- Sri Lanka71 late
- United Republic of Tanzania53 late
- Japan44 late
- Brazil40 late
- Hong Kong S.A.R.31 late
- Kenya30 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.