Transit times / Loblaw Inc
Loblaw Inc
93 ocean import shipments. Delayed 27.7 points less often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 2 carriers used.
- MSC9214 late
- Evergreen11 late
By route
All 10 lanes.
- Cape Town > Newark, Nj590 late
- Port Elizabeth > Newark, Nj110 late
- Ning Bo > Seattle, Wa77 late
- Yantian > Seattle, Wa44 late
- All Other Panama West Coast Region Ports > Los Angeles, Ca30 late
- Port Natal > Newark, Nj30 late
- All Other Panama West Coast Region Ports > Long Beach, Ca20 late
- Shanghai > Seattle, Wa22 late
- Kaohsiung > Tacoma, Wa11 late
- All Other Viet Nam Ports > Seattle, Wa11 late
By supplier
Top 12 of 19 suppliers; 7 shipments across the remaining 7 not shown.
- Wp Fresh Distributors Pty Ltd570 late
- Safresco South Africa Pty Ltd80 late
- Procesadora Laran Sac40 late
- Ningbo Linhua Plastic Co Ltd44 late
- Yang&Young International Co Ltd33 late
- Swellenfruit Packing Pty Ltd20 late
- Capespan South Africa Pty Ltd20 late
- Zhuji Sanfei Socks Co Ltd22 late
- Freshworld Pty Ltd10 late
- Everseason Pty Ltd10 late
- Good Hope Marketing Pty Ltd10 late
- Southern Fruit Growers Pty Ltd10 late
By vessel
Vessel names are in the most recent data only — 93 of 93 shipments (100%) name one, across 8 ships. This chart covers that subset, not the whole.
- Msc Anisha R.380 late
- Msc Carmen350 late
- Msc Pina66 late
- Manzanillo Bridge55 late
- Msc Mexico V33 late
- Msc Hortense30 late
- Msc Athos20 late
- Ever Sigma11 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Newark, Nj730 late
- Seattle, Wa1414 late
- Los Angeles, Ca30 late
- Long Beach, Ca20 late
- Tacoma, Wa11 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- South Africa700 late
- China99 late
- Peru40 late
- Thailand44 late
- Brazil30 late
- Malaysia11 late
- Vietnam11 late
- Chile10 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.