Transit times / Medical Depot Inc
Medical Depot Inc
311 ocean import shipments. Delayed 49.8 points more often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 6 carriers used.
- COSCO109104 late
- HMM9390 late
- KFUN7167 late
- Hapag Lloyd2113 late
- OOCL1616 late
- CMA CGM11 late
By route
Top 12 of 31 lanes; 54 shipments across the remaining 19 not shown.
- Pusan > Savannah, Ga.4141 late
- Yantian > Savannah, Ga.3935 late
- Yantian > Newark, Nj3129 late
- Yangshan > Savannah, Ga.2828 late
- Shanghai > Savannah, Ga.2727 late
- Yangshan > Newark, Nj2424 late
- Yantian > Los Angeles, Ca1611 late
- Yangshan > Long Beach, Ca1212 late
- Yantian > Long Beach, Ca116 late
- Shanghai > Newark, Nj117 late
- Ning Bo > Long Beach, Ca99 late
- Shanghai > Los Angeles, Ca88 late
By supplier
Top 12 of 51 suppliers; 106 shipments across the remaining 39 not shown.
- Com Bridge International Co Ltd3128 late
- Jiangsu Jumao X Care Medical Equipm2424 late
- Jiangsu Assure Medical Equipment C2424 late
- Bliss Health Products Co Ltd2017 late
- Chang Cheng Fa Enterprise Co Ltd2020 late
- Jiangsu Assure Medical Equipment Co1717 late
- Shenyang Henyi Enterprise Company1414 late
- Jiangsu Jumao X Care Medical Equip1414 late
- Nantong Shunlong Physical Therapy E1212 late
- Combo Zhongshan Medical Equipment116 late
- Zhongshan Bliss Medical Instrument99 late
- Com Bridge International Company Li98 late
By vessel
Vessel names are in the most recent data only — 311 of 311 shipments (100%) name one, across 54 ships. This chart covers that subset, not the whole.
- Oocl Tulip4545 late
- One Aquila4141 late
- Ym Tiptop2525 late
- Oocl Magnolia2020 late
- Hmm Hope1414 late
- Oocl France1313 late
- Cosco Shipping Camellia1313 late
- Cosco Shipping Orchid99 late
- Ym Utility88 late
- Jade I77 late
- Cosco Thailand77 late
- Hmm Aquamarine66 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Savannah, Ga.140136 late
- Newark, Nj7670 late
- Long Beach, Ca4035 late
- Los Angeles, Ca2823 late
- Oakland, Ca1313 late
- Tampa, Fla.77 late
- Houston, Texas55 late
- Baltimore, Md.22 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China273254 late
- Taiwan2221 late
- Cambodia88 late
- South Korea77 late
- Vietnam11 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.