Transit times / Pan Pacific Express Corp
Pan Pacific Express Corp
83 ocean import shipments. Delayed 5.2 points less often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 11 carriers used.
- Evergreen352 late
- Wan Hai Lines2828 late
- CMA CGM80 late
- COSCO21 late
- MSC20 late
- Zim20 late
- Yang Ming20 late
- HEDE Shipping10 late
- Maersk10 late
- ONE10 late
- HMM11 late
By route
Top 12 of 24 lanes; 12 shipments across the remaining 12 not shown.
- Kaohsiung > Los Angeles, Ca260 late
- Taipei > Los Angeles, Ca1310 late
- Shekou > Los Angeles, Ca99 late
- Vung Tau > Los Angeles, Ca64 late
- Taipei > Oakland, Ca30 late
- Yantian > Los Angeles, Ca30 late
- Shanghai > Los Angeles, Ca33 late
- Ning Bo > Savannah, Ga.22 late
- Kaohsiung > Norfolk, Va.20 late
- Xiamen > Los Angeles, Ca22 late
- Kaohsiung > Oakland, Ca10 late
- Nansha > Los Angeles, Ca10 late
By supplier
Top 12 of 19 suppliers; 7 shipments across the remaining 7 not shown.
- Pacific Star Express Corp307 late
- Pacific Concord Int L Ltd130 late
- Pacific Star Express Hong Kong Co65 late
- Star Concord Vietnam Co Ltd64 late
- Pacific Star Express52 late
- Pacific Star Express China Co Lt55 late
- Pacific Star Express China Co Ltd32 late
- Star Concord Thailand Co Ltd20 late
- Pacific Concord International Limit22 late
- Pacific Star Express China Co21 late
- Concord Tianjin International Freig10 late
- Star Concord India Private Limited11 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca6628 late
- Oakland, Ca40 late
- Savannah, Ga.32 late
- Long Beach, Ca30 late
- Norfolk, Va.20 late
- New York, N.Y.11 late
- Newark, Nj10 late
- Miami, Florida10 late
- Houston, Texas10 late
- Charleston, S.C.11 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- Taiwan4710 late
- China1911 late
- Hong Kong S.A.R.65 late
- Vietnam64 late
- Thailand20 late
- India11 late
- Italy10 late
- Malaysia11 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.