Transit times / Resideo Usa Llc

Resideo Usa Llc

154 ocean import shipments. Delayed 10.7 points more often than the dataset average of 43.8%.

154
Shipments
54.5%
Arrived late
84 shipments
8.7 days
Average delay, when late
median 11 days
16 days
Worst single delay

How late, when late

Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.

5
3.2%
Early
65
42.2%
On time
27
17.5%
1–3 days
8
5.2%
4–7 days
27
17.5%
8–14 days
22
14.3%
15+ days

By carrier

All 1 carriers used.

% delayed avg days late, when laten = shipments
  1. Expeditors International
    54.5%
    8.7d
    15484 late

By route

Top 12 of 17 lanes; 5 shipments across the remaining 5 not shown.

% delayed avg days late, when laten = shipments
  1. Yantian > Long Beach, Ca
    59.2%
    10.4d
    4929 late
  2. Hong Kong > Long Beach, Ca
    0%
    300 late
  3. Ning Bo > Long Beach, Ca
    100%
    8.6d
    2929 late
  4. Yantian > Los Angeles, Ca
    34.8%
    4.1d
    238 late
  5. Genova > Newark, Nj
    100%
    13.4d
    55 late
  6. Shanghai > Long Beach, Ca
    100%
    7.5d
    44 late
  7. Rotterdam > Norfolk, Va.
    100%
    8.5d
    22 late
  8. Ning Bo > Los Angeles, Ca
    0%
    20 late
  9. Dagu/Tanggu > Long Beach, Ca
    0%
    20 late
  10. Keelung > Los Angeles, Ca
    100%
    8d
    11 late
  11. Yantian > Tacoma, Wa
    100%
    5d
    11 late
  12. Shanghai > Los Angeles, Ca
    100%
    8d
    11 late

By supplier

Top 12 of 65 suppliers; 76 shipments across the remaining 53 not shown.

% delayed avg days late, when laten = shipments
  1. Ningbo Wuyue Fire Sci Tech Co Ltd
    100%
    11.1d
    1313 late
  2. Heyuan Jsw Smart Manufacturing Co
    81.8%
    6.4d
    119 late
  3. Dongguan Otoma Industrial Co Ltd
    40%
    15d
    104 late
  4. Sun Lynn Electronic Hongkong Co
    0%
    70 late
  5. Ningbo East Electronics Limited
    66.7%
    6.8d
    64 late
  6. Imt Armaturen Srl
    100%
    13.4d
    55 late
  7. Kunzhan Plastic & Hardware Co Ltd
    60%
    3.3d
    53 late
  8. Yihua Holding Group Co Ltd
    100%
    7.8d
    55 late
  9. Union Gain Electronic Technology
    0%
    40 late
  10. Suntak Technology Limited
    0%
    40 late
  11. E&D Enterprises Limited
    0%
    40 late
  12. Goworld Display Usa Ltd
    0%
    40 late

By vessel

Vessel names are in the most recent data only — 154 of 154 shipments (100%) name one, across 34 ships. This chart covers that subset, not the whole.

% delayed avg days late, when laten = shipments
  1. Xin Fei Zhou
    0%
    210 late
  2. Msc San Francisco
    100%
    11d
    1919 late
  3. Danube
    0%
    130 late
  4. Nestos
    100%
    15d
    1010 late
  5. Oocl London
    0%
    90 late
  6. Mississippi
    100%
    15d
    88 late
  7. Colorado
    0%
    80 late
  8. Ever Mild
    0%
    60 late
  9. Msc Bianca Silvia
    100%
    3d
    66 late
  10. Conti Conquest
    0%
    50 late
  11. Zeal Lumos
    100%
    3d
    44 late
  12. Msc Milan
    100%
    12d
    44 late

Delay rate by arrival date

Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.

75%
n=8
2026-07-27
7.7%
n=26
2026-07-28
100%
n=10
2026-07-29
100%
n=1
2026-07-30
100%
n=6
2026-07-31
100%
n=4
2026-08-01
25%
n=12
2026-08-02
100%
n=1
2026-08-03
7.9%
n=38
2026-08-04
100%
n=11
2026-08-05
100%
n=2
2026-08-06
100%
n=30
2026-08-07
100%
n=4
2026-08-09
100%
n=1
2026-08-10

By destination port

Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.

% delayed avg days late, when laten = shipments
  1. Long Beach, Ca
    54.7%
    9.2d
    11764 late
  2. Los Angeles, Ca
    41.4%
    4.4d
    2912 late
  3. Newark, Nj
    100%
    13.4d
    55 late
  4. Norfolk, Va.
    100%
    8.5d
    22 late
  5. Tacoma, Wa
    100%
    5d
    11 late

By supplier country

Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.

% delayed avg days late, when laten = shipments
  1. China
    63.1%
    8.6d
    11170 late
  2. Hong Kong S.A.R.
    6.9%
    8.5d
    292 late
  3. Italy
    100%
    13.4d
    55 late
  4. Taiwan
    66.7%
    8d
    32 late
  5. Switzerland
    100%
    8.5d
    22 late
  6. Vietnam
    0%
    10 late
  7. United States of America
    100%
    3d
    11 late
  8. Thailand
    100%
    3d
    11 late
  9. India
    100%
    1d
    11 late

Reading this

Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.

A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.

Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.

Track a shipment live →