Transit times / Straight Forwarding Inc
Straight Forwarding Inc
84 ocean import shipments. Delayed 20.5 points more often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 8 carriers used.
- Wan Hai Lines2929 late
- HMM2222 late
- ONE102 late
- Evergreen90 late
- COSCO90 late
- CMA CGM20 late
- Yang Ming21 late
- Zim10 late
By route
Top 12 of 17 lanes; 5 shipments across the remaining 5 not shown.
- Qingdao > Los Angeles, Ca2121 late
- Taipei > Los Angeles, Ca1512 late
- Vung Tau > Los Angeles, Ca107 late
- Yantian > Long Beach, Ca80 late
- Shekou > Los Angeles, Ca55 late
- Xiamen > Los Angeles, Ca54 late
- Yantian > Los Angeles, Ca40 late
- Kaohsiung > Los Angeles, Ca30 late
- Hai Phong > Los Angeles, Ca32 late
- Pusan > Los Angeles, Ca30 late
- Yantian > Oakland, Ca10 late
- Hong Kong > Long Beach, Ca10 late
By supplier
Top 12 of 25 suppliers; 13 shipments across the remaining 13 not shown.
- Safround Logistics Co Ltd2321 late
- Castle International Co Ltd1312 late
- Shanghai Lead Trans International70 late
- Safround Logistics Vietnam Co Ltd76 late
- China Int50 late
- Master International Logistics30 late
- Pt Honour Lane Shipping33 late
- Shanghai Lead Trans Int L Logistics21 late
- China International Freight China22 late
- Oriental Logistics Multimodal Trans22 late
- China Int L Freight Co Ltd22 late
- Luckystar Logistics Co Ltd20 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca7253 late
- Long Beach, Ca90 late
- Oakland, Ca20 late
- Savannah, Ga.11 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China4626 late
- Taiwan2116 late
- Vietnam108 late
- Indonesia43 late
- India10 late
- Grenada10 late
- Thailand11 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.