Transit times / Tanera Transport Llc
Tanera Transport Llc
169 ocean import shipments. Delayed 5.9 points less often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 10 carriers used.
- Evergreen780 late
- Wan Hai Lines3939 late
- ONE169 late
- HEDE Shipping90 late
- Yang Ming91 late
- HMM77 late
- Zim54 late
- CMA CGM33 late
- COSCO20 late
- MSC11 late
By route
Top 12 of 20 lanes; 10 shipments across the remaining 8 not shown.
- Yantian > Los Angeles, Ca592 late
- Xiamen > Los Angeles, Ca3224 late
- Shanghai > Los Angeles, Ca1910 late
- Yantian > Savannah, Ga.132 late
- Shekou > Los Angeles, Ca1212 late
- Yantian > Oakland, Ca60 late
- Pusan > Los Angeles, Ca50 late
- Ning Bo > Los Angeles, Ca43 late
- Ning Bo > Newark, Nj33 late
- Kaohsiung > Savannah, Ga.21 late
- Xiamen > Long Beach, Ca20 late
- Vung Tau > Los Angeles, Ca21 late
By supplier
Top 12 of 17 suppliers; 5 shipments across the remaining 5 not shown.
- Orient Star Transport Int L Ltd12744 late
- Ningbo Henton Supply Chain Manageme90 late
- Orient Star Transport Intl Ltd71 late
- Temax International Logistics Co66 late
- Orient Star Transport43 late
- Orient Star Transport Internationa33 late
- Orient Star Transport International21 late
- Cohesion Freight Hk Ltd20 late
- Orient Star International10 late
- Tpl Xiamen Supply Chain Management10 late
- Ourun Logistics11 late
- Orient Star Transport Sdn Bhd11 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Los Angeles, Ca13854 late
- Savannah, Ga.164 late
- Oakland, Ca71 late
- Newark, Nj44 late
- Long Beach, Ca30 late
- Norfolk, Va.11 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- China12429 late
- Taiwan4033 late
- Thailand10 late
- Cambodia10 late
- Malaysia11 late
- Vietnam11 late
- Indonesia10 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.