Transit times / Teys Usa Inc
Teys Usa Inc
172 ocean import shipments. Delayed 3.7 points less often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 8 carriers used.
- Maersk512 late
- MSC471 late
- CMA CGM3534 late
- OOCL1919 late
- MFUS1313 late
- ANLC50 late
- Hapag Lloyd10 late
- ONE10 late
By route
Top 12 of 14 lanes; 2 shipments across the remaining 2 not shown.
- Brisbane > Philadelphia, Pa.7735 late
- Sydney > Philadelphia, Pa.327 late
- Yarraville > Philadelphia, Pa.255 late
- Kaohsiung > Long Beach, Ca1515 late
- Tauranga > Philadelphia, Pa.60 late
- Tauranga > Seattle, Wa60 late
- Hong Kong > Seattle, Wa33 late
- Brisbane > Savannah, Ga.21 late
- Tauranga > Los Angeles, Ca10 late
- Puerto Manzanillo > Savannah, Ga.10 late
- Salvador > Philadelphia, Pa.11 late
- Sao Paulo > Philadelphia, Pa.11 late
By supplier
All 12 suppliers.
- Teys Australia Pty Ltd13464 late
- Adams Food Group Pty Ltd122 late
- Coles Supermarkets Australia Pty Lt70 late
- Stanbroke Beef Pty Ltd40 late
- Sanger Australia Pty Limited41 late
- Affco New Zealand Limited30 late
- Ubp Limited20 late
- Paradigm Foods Pty Ltd20 late
- Australian Meat Group Pty Ltd10 late
- Silver Fern Farms Limited10 late
- Marfrig Global Foods S A11 late
- Naturafrig Alimentos Ltda11 late
By vessel
Vessel names are in the most recent data only — 172 of 172 shipments (100%) name one, across 18 ships. This chart covers that subset, not the whole.
- Oluf Maersk280 late
- Cma Cgm Louga2727 late
- Msc Montserrat Iii260 late
- Msc Sheffield Iii190 late
- Maersk Bratan120 late
- Marius1211 late
- Cosco Shipping Denali1111 late
- Mieke Schulte99 late
- Maersk Buton80 late
- Anl Warrnambool60 late
- Cosco Shipping Panama44 late
- Oocl San Francisco33 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Philadelphia, Pa.14249 late
- Long Beach, Ca1615 late
- Seattle, Wa104 late
- Savannah, Ga.31 late
- Los Angeles, Ca10 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- Australia16467 late
- New Zealand60 late
- Brazil22 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.