Transit times / Tractor Supply Co Of Texas L P

Tractor Supply Co Of Texas L P

351 ocean import shipments. Delayed 6.5 points less often than the dataset average of 43.8%.

351
Shipments
37.3%
Arrived late
131 shipments
3.2 days
Average delay, when late
median 2 days
15 days
Worst single delay

How late, when late

Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.

33
9.4%
Early
187
53.3%
On time
93
26.5%
1–3 days
21
6%
4–7 days
16
4.6%
8–14 days
1
0.3%
15+ days

By carrier

All 4 carriers used.

% delayed avg days late, when laten = shipments
  1. ONE
    19.9%
    1.2d
    13627 late
  2. Hapag Lloyd
    34%
    4.5d
    9733 late
  3. HMM
    57.1%
    3.6d
    7040 late
  4. CMA CGM
    64.6%
    2.9d
    4831 late

By route

Top 12 of 50 lanes; 116 shipments across the remaining 38 not shown.

% delayed avg days late, when laten = shipments
  1. Vung Tau > Los Angeles, Ca
    25.4%
    1.9d
    5915 late
  2. Vung Tau > Savannah, Ga.
    54.5%
    3.5d
    3318 late
  3. Vung Tau > Norfolk, Va.
    57.7%
    2.1d
    2615 late
  4. Hai Phong > Los Angeles, Ca
    75%
    1.6d
    2418 late
  5. Yantian > Los Angeles, Ca
    0%
    210 late
  6. Laem Chabang > Long Beach, Ca
    0%
    130 late
  7. Qingdao > Los Angeles, Ca
    9.1%
    2d
    111 late
  8. Yantian > Long Beach, Ca
    0%
    110 late
  9. Singapore > Los Angeles, Ca
    50%
    7.6d
    105 late
  10. Shanghai > Norfolk, Va.
    30%
    6d
    103 late
  11. Yantian > Newark, Nj
    66.7%
    5d
    96 late
  12. Ning Bo > Los Angeles, Ca
    37.5%
    7.3d
    83 late

By supplier

Top 12 of 107 suppliers; 219 shipments across the remaining 95 not shown.

% delayed avg days late, when laten = shipments
  1. Grand Production Co Ltd
    37.5%
    5.2d
    166 late
  2. Kunjek Viet Nam Cage No1 Joint
    60%
    1.9d
    159 late
  3. Expeditors Vietnam Co Ltd
    60%
    1.8d
    159 late
  4. Tri Star Products Co Ltd
    42.9%
    3.7d
    146 late
  5. Viition Asia Limited
    33.3%
    2.3d
    124 late
  6. Hanks Heating Appliance Technology
    72.7%
    2d
    118 late
  7. New Ray Toys Co Ltd
    33.3%
    5.3d
    93 late
  8. Tgh Cambodia Industrial Co Ltd
    77.8%
    4.9d
    97 late
  9. G U Industrial Co Ltd
    37.5%
    2.3d
    83 late
  10. Intradin Hk Co Ltd
    37.5%
    5d
    83 late
  11. Hybest Vietnam Llc
    62.5%
    3d
    85 late
  12. Y&M Enterprise Co Ltd
    71.4%
    1.4d
    75 late

By vessel

Vessel names are in the most recent data only — 351 of 351 shipments (100%) name one, across 59 ships. This chart covers that subset, not the whole.

% delayed avg days late, when laten = shipments
  1. Seattle Bridge
    45.5%
    2d
    2210 late
  2. One Singapore
    100%
    1.3d
    2020 late
  3. Conti Contessa
    0%
    170 late
  4. One Aquila
    40%
    5.5d
    156 late
  5. Cma Cgm Amazon
    0%
    150 late
  6. Cma Cgm J. Adams
    100%
    1.9d
    1414 late
  7. One Forever
    0%
    140 late
  8. Hmm Hope
    53.8%
    1d
    137 late
  9. Ulsan Express
    0%
    130 late
  10. Conti Conquest
    30.8%
    9d
    134 late
  11. Zeal Lumos
    0%
    110 late
  12. Tempanos
    100%
    6.6d
    1111 late

Delay rate by arrival date

Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.

3.7%
n=27
2026-07-27
4.2%
n=24
2026-07-28
100%
n=4
2026-07-29
38.5%
n=26
2026-07-30
0%
n=11
2026-07-31
39.3%
n=28
2026-08-01
7.8%
n=51
2026-08-02
79.2%
n=24
2026-08-03
48.1%
n=27
2026-08-04
78.6%
n=28
2026-08-05
36.4%
n=11
2026-08-06
95.8%
n=24
2026-08-07
30.8%
n=13
2026-08-08
0%
n=29
2026-08-09
75%
n=12
2026-08-10
50%
n=12
2026-08-11

By destination port

Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.

% delayed avg days late, when laten = shipments
  1. Los Angeles, Ca
    31%
    2.8d
    14244 late
  2. Savannah, Ga.
    60%
    3.8d
    5533 late
  3. Norfolk, Va.
    49%
    3d
    5125 late
  4. Long Beach, Ca
    5%
    8d
    402 late
  5. Newark, Nj
    58.6%
    3d
    2917 late
  6. Houston, Texas
    35.3%
    1d
    176 late
  7. Tacoma, Wa
    23.5%
    4.8d
    174 late

By supplier country

Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.

% delayed avg days late, when laten = shipments
  1. Vietnam
    45.6%
    2.2d
    14968 late
  2. China
    21.8%
    5.5d
    8719 late
  3. Cambodia
    31.9%
    3.2d
    4715 late
  4. Thailand
    43.6%
    3.9d
    3917 late
  5. Taiwan
    16.7%
    1d
    61 late
  6. Canada
    83.3%
    6.2d
    65 late
  7. India
    20%
    6d
    51 late
  8. Bangladesh
    75%
    1d
    43 late
  9. South Korea
    0%
    30 late
  10. Indonesia
    0%
    30 late
  11. Hong Kong S.A.R.
    100%
    1d
    11 late
  12. Malaysia
    100%
    4d
    11 late

Reading this

Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.

A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.

Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.