Transit times / Transworld Shipping Usa Inc
Transworld Shipping Usa Inc
71 ocean import shipments. Delayed 35.1 points more often than the dataset average of 43.8%.
How late, when late
Every shipment placed in a band. Early and on-time are shown too, so the delayed share is read against the whole, not on its own.
By carrier
All 12 carriers used.
- Yang Ming2525 late
- COSCO1212 late
- HMM77 late
- ONE52 late
- Hapag Lloyd40 late
- Zim41 late
- Wan Hai Lines44 late
- MSC31 late
- Maersk30 late
- Evergreen22 late
- CMA CGM11 late
- Atlantic Container Line11 late
By route
Top 12 of 21 lanes; 9 shipments across the remaining 9 not shown.
- Bremerhaven > Newark, Nj2121 late
- Stadersand > Los Angeles, Ca1111 late
- (port not stated) > Los Angeles, Ca65 late
- Antwerp > Los Angeles, Ca54 late
- Rotterdam > Newark, Nj54 late
- Shanghai > Los Angeles, Ca32 late
- (port not stated) > Philadelphia, Pa.20 late
- Sines > Long Beach, Ca20 late
- Istanbul > Newark, Nj20 late
- Cartagena > Miami, Florida20 late
- Singapore > Charleston, S.C.22 late
- Genova > Norfolk, Va.10 late
By supplier
All 12 suppliers.
- Transworld Shipping Gmbh5347 late
- Honour Lane Logistics Co Ltd54 late
- Honour Lane Shipping Ltd32 late
- Honour Lane Shipping Limited21 late
- Sisam Agenti Srl10 late
- Noatum Logistics Spain S A U10 late
- Genan For Industrial Import & Export An10 late
- Blue Partners Lojistik Ve Tic A S10 late
- Honour Lane Shipping Ltd Qingdao Br10 late
- Honour Lane Logistics Philippines11 late
- Safround Logistics Co Ltd11 late
- Blue Partners Logistics10 late
Delay rate by arrival date
Share of each day’s arrivals that came in late. A single late vessel puts the same delay on every container it carried, so a tall isolated bar is usually one sailing rather than a bad week — the count under each bar is the check on that.
By destination port
Where the delay actually lands — a congested discharge port shows up here rather than under the carrier.
- Newark, Nj3027 late
- Los Angeles, Ca2623 late
- Norfolk, Va.31 late
- Savannah, Ga.33 late
- Long Beach, Ca30 late
- Philadelphia, Pa.20 late
- Miami, Florida20 late
- Charleston, S.C.22 late
By supplier country
Origin-side effects: a country whose shipments are consistently late points at booking or documentation, not at the ocean leg.
- Germany5145 late
- China74 late
- Thailand32 late
- Turkey20 late
- Italy10 late
- Spain10 late
- South Korea11 late
- Egypt10 late
- Vietnam11 late
- Philippines11 late
- Belgium11 late
- Netherlands11 late
Reading this
Delay is measured against each shipment’s own estimated arrival on the same manifest record, so it reflects what was promised for that shipment. Average days late is taken over delayed shipments only.
A delay is usually a property of one sailing: every container off a late ship arrives the same day. It is not only that — an estimated arrival is set per bill of lading at booking, so two containers on the same ship can carry different delays. Across the shipments that name a vessel, two thirds of same-ship, same-day groups share a single delay value and a third do not.
Watch the counts. A carrier or lane with a handful of shipments can show a dramatic rate off one or two late arrivals — the n beside every bar is there so a small sample is never mistaken for a pattern.