About this product
M8 screws with 2 washers, Made of iron, copper-plated
Washer: Red copper material
standard M8 motorcycle brake line
Stainless steel is normal with a rubber or plastic cover
Create a customized component to install on a motorcycle
Inner: nylon material
Middle: stainless steel material
Outer: PVC plastic material
C1100 copper spacer and washer. (1mm - 5mm)
M8 oil control cable to install on a motorcycle, 750 mm
Which mounts a shock absorber system called HTS. And we should create this kit (BYPASS) which therefore combines the two shock absorbers; and makes handling much smoother.
air passes inside these cables for shock absorber pressure
Where on one side the component already present on the shock absorber is screwed; and on the other side it screws onto the shock absorber.
RFQ
1. How do you design a wire cable assembly?
Of course, we have to know your application first, and a number of factors have to be considered, such as workload, safety abrasion, environment, cycle life, flexibility, and cost when we design the steel wire cable assembly.
2. What's the safety factor of your product?
Generally, we use a 5 to 1 or 3 to 1 safety factor when we design it; for example, the breaking load is 1000 N (100 kg). The safety factor is 5:1 (200 N). Breaking strength should never be considered the rope's working load.
3. What's the lead time of my order?
It largely depends on the size of your order. Normally, 15 days. If you are in urgent need of it, we will try our best to meet your requirement.
4. How to place an order?
We produce according to customers' specifications, so you'd better give us complete information as specified below: Material, Diameter, Construction, Coating, Length, Packing, Quantity, Remarks.
Packaging Details
Packaging Type: Each lock is individually packed in a neutral polybag, then placed into a sturdy export carton.
Carton Specification: Standard 5-ply corrugated carton, with bubble wrap or foam inserts for shock protection.
Customization: OEM/ODM packaging (custom logo, color box, hang tag) is available upon request.
Labeling: Standard shipping marks and product labels (including model number, quantity, and weight) are included for easy logistics management.
Shipping & Lead Time
Sample Lead Time: 3–7 working days
Bulk Production Lead Time: 15–25 working days (based on order quantity)
Shipping Options:
By sea: FOB/CIF/CNF terms available, major ports including Shenzhen, Guangzhou, Ningbo
By air: Express courier (DHL, FedEx, UPS) for small orders, door-to-door delivery
Delivery Speed:
Express: 3–7 days to most countries
Air freight: 7–15 days
Sea freight: 20–45 days, depending on destination port